Energy & utilities 2025 20 weeks

Tanfield Grid

Regional distribution utility, 2.1 million customers

Engagement
20 weeks
Office
London
Lead partner
Ameera Hassan

The challenge

Outage minutes had risen four years running while the connection queue for new generation reached forty-two days per study. Control-room decisions still routed through three people and a whiteboard photo.

What we did

Ameera Hassan's team rebuilt the outage data model from the SCADA export up, then automated the connection studies that did not need an engineer's judgment. Decision rights in the control room were re-mapped from forty traced decisions.

The queue analytics ran on the utility's own stack, owned by two engineers hired into the client team during the program.

The outcome

Outage minutes per customer fell by a third year over year. Connection studies now clear in eleven days median, and the control room runs its own models without contractor support.

Impact metrics

Outage minutes per customer-year −72 min

Before 218 min
After 146 min

Connection study median −31 days

Before 42 days
After 11 days

Studies automated end-to-end +64%

Before 0 %
After 64 %

Bars are scaled per metric against its own maximum. Direction of improvement: Outage minutes per customer-year, Connection study median, Studies automated end-to-end — see each metric.

Expertise behind this program

Facing something similar?

Describe your baseline and target. If we have run it, we will say so — and show you the number.