01 Diagnose
Find the constraint before the fix
Two weeks on site with the people who run the process. One page of findings, priced gap by gap, signed by the plant manager before any program is proposed.
- Shift-level measurement, not interviews alone
- Every gap valued at the month’s actual selling price
- A signed problem statement before a proposal exists
02 Design
Set the target and the owner in the same meeting
The program is designed with the budget holder in the room: one signed metric, one owner per lever, and a sequence of decisions with dates.
- A single metric the board can audit
- Decision rights mapped before the structure is drawn
- Suppliers and IT at the table from design review two
03 Deliver
Run the change with your team, not around it
Joint teams work the constraint first. A weekly rhythm, decisions logged the same day, and evidence packs the client can re-present without us.
- Your engineers lead the line; we bring the method
- Weekly numbers, same-day decision logs
- No parallel forty-initiative list
04 Sustain
Keep the gain after the invoice clears
Scorecards and trained internal leads stay in place for twelve months. Published results are measured a year later, not at kickoff.
- Twelve months of scorecard review included
- Internal leads certified against the method
- Results re-measured at month twelve