Metals & mining 2025 20 weeks

Vantaal Aluminium

Mid-cap aluminium producer, two smelters and a rolling mill

Engagement
20 weeks
Office
Austin
Lead partner
Tomasz Okafor

The challenge

Vantaal's scrap rate had drifted up for three quarters while energy contracts rolled into a volatile market. The board wanted one program, not ten initiatives, and a number it could audit.

What we did

Two weeks of shift-level measurement traced the scrap to three sources: furnace practice on alloy changes, a maintenance calendar that kept slipping, and dross handling nobody owned. Tomasz Okafor's team priced each gap and closed all but the maintenance calendar in the first eight weeks.

The energy team renegotiated the supply contracts with a stated volatility plan: hedge ratios, demand response participation, and a load-shedding sequence agreed with production before winter.

The outcome

Scrap fell by two-fifths within two quarters and held for a full year after the engagement closed. Energy per tonne fell 9 percent, and the cold winter passed without an unplanned curtailment.

Impact metrics

Scrap rate −3.2%

Before 8.1 %
After 4.9 %

Energy per tonne −53 kWh

Before 615 kWh
After 562 kWh

Unplanned curtailment hours −27 h/quarter

Before 31 h/quarter
After 4 h/quarter

Bars are scaled per metric against its own maximum. Direction of improvement: Scrap rate, Energy per tonne, Unplanned curtailment hours — lower is better.