Operations performance

Throughput, yield, and cost per unit — diagnosed on the line, not in the deck.

Case studies
7
Insight pieces
8
Practice leads
11

Operations work starts with two weeks on site: one page of findings, signed by the plant manager, before any program is proposed. We measure where the units are lost — scrap, changeover, waiting, rework — and price each gap before choosing which to close.

Programs run in joint teams with the client's own engineers. Every intervention carries an owner, a weekly number, and a date. Published engagements report results twelve months after the invoice, not at kickoff.

The method in three moves

  1. 01

    Diagnose on the floor

    Two weeks of shift-level measurement with the client's engineers. One page of findings, priced gap by gap.

  2. 02

    Fix the constraint first

    The team works the bottleneck only: changeover practice, maintenance calendar, staffing pattern. No parallel forty-initiative list.

  3. 03

    Hold the gain

    Scorecards and trained internal leads stay in place for twelve months after the engagement ends.

Case studies using this capability

All case studies

Insight on this capability

Open the library

Who leads this capability

Find an expert

Talk to a partner before you write the plan

Describe the decision in front of you. A partner who has run it replies within two business days — with questions, not a brochure.